Transcript title
Carpenter X
Credits
3
Grading mode
Standard letter grades
Total contact hours
55
Lecture hours
22
Lab hours
33
Prerequisites
APR 217C.
Course Description
Covers the principles, equipment, and methods used to perform site layout using differential leveling and site layout requiring angular and distance measurements. Reviews trades mathematics to perform calculations related to angular measurements. Covers leveling and measurement tool use and application.
Course learning outcomes
1. Diagram a safe construction site layout.
2. Identify occupations, responsibilities, requirements, and tools of construction site layout.
3. Perform construction trade mathematics for site dimensions, building lines, elevations.
4. Use the tools and instruments of site layout.
5. Describe differential leveling.
Content outline
- Site layout, differential leveling
- Occupations and job scope and responsibilities for surveyors, filed engineers, carpenters
- Reading, interpretation, and use of site and plot plan drawings
- Laser instruments, tools, and communication for site layout
- Site layout, angular and distance measurement, building lines, elevations, and trigonometric leveling
- Transits, theodolites, electronic distance measurement, total stations use for site layout
- Construction mathematics for site layout
Required materials
Textbook is required.